Newly purchasedRoots BlowerInstallation is unavoidable before use, so what details need to be paid attention to in the process of Roots blower installation? The following Roots blower editorial take you to understand.
Installing a Roots blower isn't considered difficult, but it won't be easy either. Foundation acceptance and alignment, hot iron layout, blower/motor seating, blower/motor leveling and squaring, ground bolt grouting, blower and motor shaft alignment check and adjustment, secondary grouting, and final leveling and squaring.
As the fan working principle is that the motor drives the fan blade to rotate at high speed to generate wind pressure, the safety of the operation is very important, so the installation steps and related precautions are basically set for this . Installation of the first step on the requirement to open the box acceptance, is to ensure that the fan intact, to avoid running after flying some strange things.
In addition to acceptance of the Roots blower machine, but also acceptance of the foundation plane is flat, there is no leakage cracks honeycomb surface, etc., foot bolt hole location is correct, verticality has not reached the design requirements, the elevation of the concrete foundation is enough 。。。。。 After all the steps are to ensure that the fan is fixed, if it is not installed stable, resonance will lead to the original small problem is infinitely enlarged.
Roots blower pad iron, is also a study, fan pad iron will generally be arranged on both sides of the foot bolt and the bottom plate, the base of the four corners, the key is to be sure and the foundation close contact.
Roots blower must be put on the level, the first foot bolt into the designated position of the reserved hole, the nut full buckle screwed on, with a level meter to measure the level, the tolerance is not greater than 0.5/1000mm, while holding a pad iron, where the low pad where.
After the equipment is leveled and squared, the pad iron should be exposed to the bottom surface of the equipment base by 10-30mm, and the length of the pad iron group extending into the equipment base surface should exceed the holes of the ground bolts.
The final step in the installation of a Roots blower is the enjoyable grouting time, where a thick slurry fills the void and fills every tiny gap, binding the equipment to the foundation.